Back to Search View Original Cite This Article

Abstract

<jats:p>The article examines transformation of the project finance mechanisms for mining companies in conditions of increasing regulatory requirements for the bank capital adequacy and the borrower credit quality. The study hypothesizes that the tightening of prudential standards (Basel III / Basel 3.1) combined with the increasing Bank of Russia key interest rate leads to a structural shift in the mining project financing models – from conventional bank lending toward hybrid schemes involving development institutions, off-take agreements, and public-private partnerships. The methodological framework includes the discounted cash flow analysis (DCF), debt service coverage ratio (DSCR), loan life coverage ratio (LLCR), scenario-based NPV sensitivity analysis to price and interest rate shocks, and a comparative analysis of financial models for copper, gold, and iron ore mining projects in the Russian Federation over 2020–2025. The empirical base covers 18 mining projects with the aggregate capital expenditure exceeding 1.2 trillion rubles. The study found that an increase in the Bank of Russia key interest rate from 7.5% to 21% resulted in an increase of the weighted average cost of the debt capital by 11.4 percentage points, reducing the estimated NPV of a typical copper mining project by 34–42%. The minimum DSCR threshold acceptable to banks increased from 1.25x to 1.50x–1.70x. The share of the hybrid financing schemes went up from 18% in 2020 to 47% in 2025. The results obtained demonstrate that application of the VEB.RF Project Finance Factory mechanism combined with the off-take agreements reduces the effective borrowing rate by 3.5–5.2 percentage points, restoring investment attractiveness of the projects. The practical significance of the research lies in developing an adaptive financial model that integrates prudential constraints into efficiency assessment of the mining project.</jats:p>

Show More

Keywords

mining project bank rate from

Related Articles

PORE

About

Connect